Requirement:
☐ You must have the user role Installer or PV System Administrator (see Section13.1,
page120).
Procedure:
1. Select Configuration > PV system properties in the page and menu selection.
2. Select the tab Parameters.
3. Select [Edit].
☑ The menu for parameter settings opens.
4. Select the appropriate option in the area Grid management services via Ethernet based
communication:
• If the SunnyHomeManager does not have to implement any grid operator
specifications, select No (default setting).
• If the Sunny Home Manager does have to implement grid operator specifications, select
Yes and if necessary enter a different port in the field Port. Tip: The default setting Port
502 can normally remain set. You may have to change the port if there are several
Modbus devices in the network.
5. Select [Save].
12.11 Setting the Optimization Target
The optimization target defines the objectives you wish to achieve with your SunnyHomeManager
system:
• Highest possible self-consumption (environmental aspect - ecological)
• Highest possible cost savings (business aspect - economical)
The optimization target affects the following components:
• Load control via the SunnyHomeManager (either directly via cable-based communication or
indirectly via radio-controlled sockets)
• Recommended actions in the diagram Forecast and Recommended Action on the page
Current Status and Forecast
Requirements:
☐ The feed-in tariff, self-consumption tariff and electricity tariff must be entered (see
Section12.8, page113).
☐ You must have the user role Installer or PV System Administrator (see Section13.1,
page120).
Procedure:
1. Select Configuration > PV system properties in the page and menu selection.
2. Select the tab Parameters.