3. In the table, in the column Operating mode, select the button for the desired operating mode
next to the required load.
4. Select the desired operating mode:
Operating mode/LED behavior Explanation
Automatic/LED is flashing orange
(switched off) or green (switched
on)
Control of the SMAradio-controlled socket by the
SunnyHomeManager
Depending on the current control command of the
SunnyHomeManager, the SMAradio-controlled
socket is either switched on or off in this mode.
This operating mode cannot be set for the load type
Measure only
Switch on/LED is glowing green No control of the SMAradio-controlled socket by the
SunnyHomeManager
The SMAradio-controlled socket is switched on and
switches to the operating mode On. The connected
load can draw electric current.
Switch off/LED is glowing orange No control of the SMAradio-controlled socket by the
SunnyHomeManager
The SMAradio-controlled socket is switched off and
switches to the operating mode Off. The connected
load cannot draw electric current.
After a short time, the selected operating mode is shown as activated on the SunnyPortal user
interface.
9.2.6.2 Setting the Operating Mode of the PlugwiseRadio-Controlled
Socket
Configuring Plugwise radio-controlled sockets
You can only set the operating mode of Plugwise radio-controlled sockets that are managed
via the SunnyHomeManager via Sunny Portal or the Sunny Portal app.
Plugwise radio-controlled sockets that are managed via the SunnyHomeManager can not be
configured via the Plugwise app. Only the data of these Plugwise radio-controlled sockets will
be displayed. If you would like to manage a specific Plugwise radio-controlled socket via the
Plugwise app, you must remove this from your SunnyHomeManager system (see
Section10.5, page98).
Requirements:
The Plugwise radio-controlled socket must be assigned to the connected load (see
Section9.2.4, page76).
In SunnyPortal, the data request interval must be set to Automatic (see Section8.7,
page69).