Setup and connection
58 Operating Instructions Soyer Bolzenschweißtechnik
12. Setup and connection
12.1 Requirements for the installation location
The installation location for the stud welding device must be clean and dry.
Ensure that ventilation for the stud welding device is sufficient. Do not install the
stud welding device in an unventilated room. There is a danger of overheating.
Ensure that the installation surface is flat, clean and stable.
The installation location and workplace must comply with legal requirements.
Ensure that the installation location has a good accessibility for maintenance
work.
Make sure that the stud welding device cannot be soiled by dust (especially metal
dust or chips) caused by work in the immediate surroundings (e.g. grinding work).
DA NGER
!
Danger from humid operation site
There is a danger of electrocution when operating the stud welding device in a
humid environment.
The stud welding device should only be operated in a dry environment.
CAUTIONCAUTION
Danger from welding vapours
Vapours that are dangerous to health may occur, depending on the material of
the workpiece and/or the welding stud.
Ensure suitable suction of welding vapours, if necessary.