96 TS 500i
: Pull bushing (1) of the throttle
cable out of the mount (2) and
unhook the ball of the throttle
cable from the throttle shutter
lever (arrow)
– Examine the throttle cable,
replace if necessary
Installation
: Hook ball of the throttle cable (1)
into the throttle shutter lever
(arrow) and pull it until it clicks
into place
: Push the bushing (2) into the
mount (3)
1307RA162 TG
1
2
1307RA163 TG
2
3
1
: Align the air baffle (1) so that the
pegs (arrows) engage in the
profile of the tank housing
: Press the air baffle (1) until the
tab (2) snaps into place
: Push the bushing (1) into the
mount (arrow)
– Install the control unit, b 7.3
– Fit the shroud, b 6.4
– Check correct functioning
– the throttle cable must move
easily and when the throttle
trigger is in the full throttle
position, the throttle shutter must
be open all the way
– Reassemble remaining parts in
reverse order
1307RA164 TG
2
1
1307RA165 TG
1
11.3 Injection valve
– Remove the engine, b 6.5
: Unscrew the screw (1)
: Remove the ground wire (2) and
cover (3)
: Unscrew the screw (1) and
remove the cable holder (2)
: Pull the bushing (1) and wiring
harness (2) out of the guides
(arrows) and set them aside
1307RA090 TG
1
3
2
1307RA091 TG
1
2
1
1307RA092 TG
2