Chapter 7 Installation
Initial Inspection
Operating and Programming Manual 119
Initial Inspection
Inspect the shipping container and cushioning material for signs of
damage.
• If damage is evident, keep the packing materials until the contents of the
shipment have been checked for completeness and the instrument has been
checked mechanically and electrically.
• If the contents are incomplete, if there is mechanical damage or defect, or if
the instrument or some component fails operational verification or full
performance test, notify the nearest Symmetricom office.
• If the shipping container is damaged, or the cushioning material shows signs
of stress, notify the carrier as well as the Symmetricom office.
Keep the shipping materials for the carrier’s inspection. The
Symmetricom office will arrange for repair or replacement at
Symmetricom’s option without waiting for a claim settlement.
TO AVOID HAZARDOUS ELECTRIC SHOCK, DO NOT
PERFORM ELECTRICAL TESTS WHEN THERE ARE SIGNS
OF SHIPPING DAMAGE TO ANY PORTION OF THE OUTER
ENCLOSURE (COVERS, PANELS, CONNECTORS, LEDS,
ETC.).