EasyManua.ls Logo

Technogym BIOSTRENGTH LINE - Page 249

Technogym BIOSTRENGTH LINE
646 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.75
7.2.31. DISASSEMBLING THE PRIMARY SHAFT
Figure 7.2.31-1
Follow the steps described in paragraphs 7.2.26.
“Disassembling the weight stack frame guard”,
7.2.29. “Disassembling the bell” and 7.2.30.
“Disassembling the primary shaft - secondary
shaft chain”.
1. Unscrew the 4 screws a using a 17-gauge
wrench.
2. Remove the PRIMARY SHAFT.
To disassemble the components of the
PRIMARY SHAFT, place it on a bench or flat
surface. Then:
To disassemble the bearing b:
1. Unscrew the two dowels using a 2-gauge
hexagonal T-wrench.
2. Remove the bearing.
To disassemble the stop c:
1. Remove the bearing b.
2. Use a 4-gauge hexagonal T-wrench to
unscrew the dowel d.
3. Remove the stop.
To disassemble the pinion e:
1. Remove the bearing b, and the stop c.
2. Use a 4-gauge hexagonal T-wrench to
unscrew the dowel f.
3. Remove the pinion.
To disassemble the bearing g:
1. Remove the bearing b, the stop c, and the
pinion e.
2. Use a 3-gauge T-wrench to unscrew the 2
dowels h.
3. Remove the bearing.
Continued on next page →

Table of Contents