4. INSTALLATION AND ELECTRICAL
CONNECTION
4.1 PRE-INSTALLATION REQUIREMENTS
For details, see the Pre-installation requirements, available on Technogym Direct.
4.2 SHIPPING THE EQUIPMENT
For details, see the Logistics E-Learning courses.
4.3 INSTALLING THE EQUIPMENT
For details, see the Assembling instructions shipped with the equipment and the Logistics E-Learn-
ing courses.
4.4 PLACE OF USAGE
Make sure that the location of installation satises the following requirements:
• Temperature of between +10°C and +25°C;
• A at, stable and vibration-free surface that is capable of supporting the weight of both the
equipment and the user. Do not install on oating oors;
• Free space - at least 60 cm wide- around the product.
Fig. 13
TECHNOGYM BIKE LIVE Technical Service Guide
Rev. 2.0
- 29 -TSG-00187-EN - Uncontrolled copy if printed