EasyManua.ls Logo

Terumo CDI OneView - Page 99

Default Icon
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-7
Troubleshooting
GAS CALIBRATIONGAS CALIBRATION
MessageMessage Meaning and Corrective ActionMeaning and Corrective Action
Number of calibrations
displays "- -"
or
Replace Gas (1 or 2)
G403
G404
G417
G419
One or both of the gas bottles in the Calibrator has
insufcient gas to complete a calibration.
Replace the empty gas bottle(s) and conrm gas
bottles have been secured in the gas slot(s) by
turning until resistance is felt. If the error persists,
contact Terumo Cardiovascular Technical Support.
Calibration Error
G409
G410
The Calibrator detects gas leakage. Replace the gas
bottle(s).
Conrm gas bottles have been secured in the gas
slot by turning until resistance is felt.
Calibration interrupted
Calibration has been
aborted
G413
Calibration was interrupted due to changing the
number of BPM(s) in the Calibrator after calibration
was initiated. The calibration process must be
restarted with the intended number of BPM(s).
Note: You will need to replace the Shunt Sensor(s)
on the BPM(s) before restarting calibration.
Calibration Error
G415
G416
G418
An issue was detected with the internal pressure
valves in the Calibrator. It may be possible to reset
the system by disconnecting and reconnecting it
to the Core. If the issue persists, contact Terumo
Cardiovascular Technical Support.
Note: You will need to replace the Shunt Sensor(s)
on the BPM(s) before restarting calibration.
(Arterial or Venous)
sensor timeout
G420
G421
G422
G423
A Shunt Sensor did not respond to the calibration
gas in the time expected.
Retry calibration for the BPM(s) with new Shunt
Sensor(s). Ensure the sensor(s) are properly
engaged with the BPM(s). Ensure proper placement
of the BPM(s) in the Calibrator. If the issue persists,
contact Terumo Cardiovascular Technical Support.

Table of Contents