1.5 Transport, Storage and Handling
Move the robot to the zero position by xArm Studio, then put the
xArm robot and Control Box in the original packaging.
Transport the robot in the original packaging.
Lift both tubes of the robot arm at the same time when moving it
from the packaging to the installation place. Hold the robot in
place until all mounting bolts are securely tightened at the base
of the robot.
The controller box shall be lifted by the handle.
Save the packaging material in a dry place, you may need to pack
down and move the robot in the future.
1.6 Power box placement height
The control box should be placed at a height of 0.6m to 1.5m
1.7 Power Connection
The power cut-off method of this product is a plug/socket connection, so
when using this product, it is recommended to equip with a suitable
switching device with sufficient breaking capacity (such as an air switch;
insulation voltage: 400V AC; rated current: 10A)

Table of Contents

Other manuals for UFactory xArm

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the UFactory xArm and is the answer not in the manual?

UFactory xArm Specifications

General IconGeneral
Payload5 kg
Repeatability±0.1 mm
Programming LanguagePython, C++, ROS
Communication InterfaceEthernet
Operating Temperature0°C to 45°C