2500 Automatic Tank Gauge
12 Installation and Operations Manual
Installation Steps Checklist
When installing a 2500 ATG system on a cone roof tank, complete each installation step below.
Check off a step when it is complete. Refer to “Installation Schematics” on page 21 for overall
dimensions.
Table 2: Cone Roof Tank — Installation Steps Checklist
Bolted Tank
Order Code T05, T15
Installation parts supplied include:
• 90° Elbow assembly (x2)
• Guide Wire bottom anchor
• Guide Wires
• Support bracket assembly
• Support bracket (x7)
• gauge head and tape
• Float
• Guide Wire top anchors (x2)
• Tape connectors
• 1-1/2 Deck flange
Figure 6: Bolted Tank
Step “Description” and Page Number Complete
1
“Tank Roof Entry - Cone Roof Tank” on page 23
2
“Installing Anchors and Guide Wires” on page 25
3
“Installing Support Brackets & Pipework” on page 27
4
“Installing a Gauge Head at Grade Level” on page 28
5
“Float installation on an Out-of-Service Tank” on page 30
6
“Connecting the Tape to the Float” on page 30
7
“Feeding the Tape to a Gauge Head Located at Grade Level” on page 34
8
“Install Tape in the Gauge Head” on page 35
9
“Reset the Counter” on page 40
10
“Calibrate the Counter” on page 41
11
“Initial Lubrication” on page 42
12
“Install a Transmitter and Replace all Covers” on page 42
13
“Initial Operation” on page 43