EasyManua.ls Logo

Varec 2500 - Interface Service

Varec 2500
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Varec, Inc. 19
Table 9: External Floating Roof Tank: No Floatwell — Installation Checklist
Interface Service
Order Code T51, T52, T53, T54
Installation parts supplied include:
90° Elbow assembly (x2)
Gauge 'U' bolt kit
Guide Wire bottom anchor
Guide Wires
Support bracket (x6)
gauge head and tape
Interface float
Guide Wire top anchors (x2)
Tape connectors
Figure 13: Interface Service
Installation Checklist
When installing a 2500 ATG system on a cone roof tank, complete each installation step below.
Check off a step when it is complete. Refer to Section “Installation Schematics” on page 21 for
overall dimensions.
9
Section “Initial Lubrication” on page 42
10
Section “Install a Transmitter and Replace all Covers” on page 42
11
Section “Initial Operation” on page 43
Step Description Complete
Step Description Complete
1
Section “Tank Roof Entry - Cone Roof Tank” on page 23
2
Section “Installing Anchors and Guide Wires” on page 25
3
Section “Installing Support Brackets & Pipework” on page 27
4
Section “Installing a Gauge Head at Grade Level” on page 28
5
Section “Float installation on an Out-of-Service Tank” on page 30
6
Section “Connecting the Tape to the Float” on page 30
7
Section “Feeding the Tape to a Gauge Head Located at Grade Level”
on page 34
8
Section “Install Tape in the Gauge Head” on page 35
9
Section “Reset the Counter” on page 40
10
Section “Calibrate the Counter” on page 41

Table of Contents