Varec, Inc. 19
Table 9: External Floating Roof Tank: No Floatwell — Installation Checklist
Interface Service
Order Code T51, T52, T53, T54
Installation parts supplied include:
• 90° Elbow assembly (x2)
• Gauge 'U' bolt kit
• Guide Wire bottom anchor
• Guide Wires
• Support bracket (x6)
• gauge head and tape
• Interface float
• Guide Wire top anchors (x2)
• Tape connectors
Figure 13: Interface Service
Installation Checklist
When installing a 2500 ATG system on a cone roof tank, complete each installation step below.
Check off a step when it is complete. Refer to Section “Installation Schematics” on page 21 for
overall dimensions.
9
Section “Initial Lubrication” on page 42
10
Section “Install a Transmitter and Replace all Covers” on page 42
11
Section “Initial Operation” on page 43
Step Description Complete
Step Description Complete
1
Section “Tank Roof Entry - Cone Roof Tank” on page 23
2
Section “Installing Anchors and Guide Wires” on page 25
3
Section “Installing Support Brackets & Pipework” on page 27
4
Section “Installing a Gauge Head at Grade Level” on page 28
5
Section “Float installation on an Out-of-Service Tank” on page 30
6
Section “Connecting the Tape to the Float” on page 30
7
Section “Feeding the Tape to a Gauge Head Located at Grade Level”
on page 34
8
Section “Install Tape in the Gauge Head” on page 35
9
Section “Reset the Counter” on page 40
10
Section “Calibrate the Counter” on page 41