EasyManua.ls Logo

Varec 2500 - Tank Top Mounting

Varec 2500
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Varec, Inc. 15
Table 5: Cone Roof Tank and Internal (Floating Roof) Pan: No Floatwell — Installation Checklist
Tank Top Mounting
Order Code T04, T14, T24, T32
Installation parts supplied include:
Gauge 'U' bolt kit
Guide Wire bottom anchor
Guide Wires
gauge head and tape
Float
Guide Wire top anchors (x2)
Tape connectors
Figure 9: Tank Top Mounting
Installation Checklist
When installing a 2500 ATG system on a cone roof tank, complete each installation step below.
Check off a step when it is complete. Refer to Section “Installation Schematics” on page 21 for
overall dimensions.
Step Description Complete
1
Tank Roof Entry - Internal Pan (Floating Roof)” on page 24
2
“Installing Support Brackets & Pipework” on page 27
3
“Installing a Gauge Head at Grade Level” on page 28
4
“Connecting the Cable to a Floating Pan” on page 33
5
“Feeding the Tape to a Gauge Head Located at Grade Level” on page 34
6
“Install Tape in the Gauge Head” on page 35
7
“Reset the Counter” on page 40
8
“Calibrate the Counter” on page 41
9
“Initial Lubrication” on page 42
10
“Install a Transmitter and Replace all Covers” on page 42
11
“Initial Operation” on page 43
Step Description Complete
1
Section “Tank Roof Entry - Cone Roof Tank” on page 23
2
Section “Installing Anchors and Guide Wires” on page 25
3
Section “Installing a Roof Reading Gauge Head” on page 29
4
Section “Float installation on an Out-of-Service Tank” on page 30

Table of Contents