N O T E: A fter the self-test is successful, the system w ill fully clear th e self-test in terval counter. If the
self-test fails this tim e, then exit the system ; w h en self-test conditio ns are satisfied again, enters
self-test once m ore.
Pro cedures for battery self-test
1. Enter the OPERATE level.
2. Click the icon .
3. Click the menu icon on the upper left corner.
4. Click the 'Battery Operations' to display the interface shown in Figure 6.10 below.
5. Respectively click 'Automatic Battery Test', 'Manual Battery Test', 'Calibrated Battery Test' and 'Battery Equalize',
then you can execute corresponding settings and operation.
Figure 6.10 B attery m anagem ent interface
6 Single UPS Operation Introduction
115
Vertiv™ Liebert® EXM2 UPS User Manual