Winkhaus blueMatic EAV4 - Installation; Routing details

Winkhaus blueMatic EAV4
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Notice: VdS acceptance:
Only with VdS-tested access control systems!
510736443
2
EN
3
blueMatic EAV4 / EAV4+ Installation, Operating and
Maintenance Instructions
Aug. Winkhaus GmbH & Co. KG ∙ Berkeser Straße 6 ∙ 98617 Meiningen
T +49  369  3950 - 0 ∙ www.winkhaus.com ∙ Subject to technical changes
Notice: After the door elements have been installed, an initial
functional check should be carried out on site in the presence of
the client or his representative and a visual / functional
acceptance report should be created.
The cables included in the scope of services should be laid at
this point in time to the intended transfer point (e.g. junction
box). They should be protected from damage and from other
trades (plaster, drywall, ...) for the subsequent construction
period.
Loose / bundled cables hanging freely should be avoided.
3 Installation
Routing for a standard triple-point lock are required to install the blueMatic
EAV4/EAV4+ locking system. In addition, routings for the motor housing are
required as indicated in the following diagrams.
3.1 Routing details
Notice: For certain markets (e.g. especially the Netherlands),
SKG-tested access control systems must be used (with the
appropriate security level, e.g. PIN code = can only be used as
SKG**)!