NoteAction
V-ring is included in the Mainten-
ance set.
Replace V-ring if leaks are detected.5
Inspection for contamination/lack of space
NoteAction
DANGER
Turn off all:
• electric power supply
• hydraulic pressure supply
• air pressure supply
to the robot, before entering the robot working
area.
1
Keep the areas around the balancing devices
clean and free from objects, such as service tools
etc.
2
Product manual - IRB 8700 125
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
3 Maintenance
3.3.8 Inspecting the balancing devices
Continued