EasyManua.ls Logo

ABB IRB 8700 Series - Page 466

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Stretch the lifting accessories to take the
weight of the lower arm.
3
To release the brakes on axis-2, connect
the 24 VDC power supply.
4
Connect to connector R2.MP2:
pin 2 = 24V
pin 5 = 0V
xx1500002705
Release the brakes on axis-2 and with the
help of an overhead crane, lift the lower
arm up as close as possible to calibration
position.
5
Remove the 24 VDC power supply.6
Unscrewing the axis-1 bracket
NoteAction
xx1500002372
Remove the axis-1 cable bracket to protect
the lower end of the cable harness. Leave
the cables attached!
Note
There is no need to disconnect the motor
cables to axis-1, 2 and 3 motors or to the
SMB unit.
1
Continues on next page
466 Product manual - IRB 8700
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.5.7 Replacing the parallel arm
Continued

Table of Contents

Related product manuals