NoteAction
Attachment screws: M6x110 (2 pcs)
xx1500002081
Fit two screws in opposite holes of the hub
and use them as removal tools.
4
xx1500002326
Lift out the hub carefully.5
Refitting the hub
Use these procedures to refit the hub.
Preparations before refitting the hub
NoteAction
Wipe the hub clean.1
Inspect the hole where the hub shall be
refitted. Wipe clean if needed.
2
Continues on next page
Product manual - IRB 8700 633
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.1 Replacing the hub
Continued