EasyManua.ls Logo

ABB IRB 8700 Series - Page 780

ABB IRB 8700 Series
848 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx1500002992
Inspect the gasket on the arm house cover.
Note
Replace if damaged.
4
Loctite 574Apply flange sealant (Loctite 574) on the
cover flange.
5
Attachment screws: M6x16 (22 pcs)Attach the arm house cover and tighten all
screws alternately and repeat once.
6
Tightening torque: 10 Nm
xx1500002987
Apply locking liquid (Loctite 243) on the
screws.
See Performing a leak-down test on
page 184.
Perform a leak-down test.7
Preparations before refitting the axis-4 motor
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Remove old paint residues and other contamina-
tion from the contact surfaces on both motor and
gearbox.
2
Wipe clean the contact surfaces from any remain-
ing contamination.
3
Also wipe clean the o-ring groove.
Continues on next page
780 Product manual - IRB 8700
3HAC052853-001 Revision: F
© Copyright 2015-2018 ABB. All rights reserved.
4 Repair
4.8.5 Replacing the axis-4 primary gearbox
Continued

Table of Contents

Related product manuals