EasyManua.ls Logo

ABB IRB6400 - Tube Shaft (U19) Installation

ABB IRB6400
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Disassembly/Assembly
Guidelines
IRB 6400
Page 7 - 18
Axis 4 Guidelines
TUBE SHAFT (U19) Installation
WARNING! BE SURE ELECTRICAL DISCONNECT SWITCH IS
OFF AND LOCKED IN OFF POSITION!
NOTE: Installation of tube shaft (U19)
requires several tools and careful assembly
procedures.
1. PROTECT ALL SLIDING SURFACES FOR THE SEAL RINGS BY COV-
ERING THEM WITH TAPE.
2. APPLY GREASE ON ALL DIAMETERS OF TUBE SHAFT WHERE
SEALS MUST PASS OVER.
3. ASSEMBLE COMPONENTS ON TUBE SHAFT (U19):
a. Install seal (U48) to shaft. Orient as shown on page 13-3 (8).
b. Grease bearing (U46) with grease (U47).
c. Install bearing (U46) to shaft. Use tool ABB # 6896 134-S and
NIKE # I-CH 612. Orient as shown on page 13-3 (7).
d. Grease seal (U45) and set in place against bearing (U46).
4. INSTALL COMPONENTS IN HOUSING (U61):
a. Lightly grease seal ring (U44) and insert into its bore in housing
(U61). Use tool ABB # 6896 134-FA. Orient as shown on page
13-3 (10).
b. Grease bearing (U43) with grease (U47) and insert into its bore in
housing (U61).
E
E
REFERENCE DRAWINGS
Exploded View:
Assemblies:
3HAA 0001-CS ( pg 13-16)
REQUIRED TOOLS
“U” (pg 7-22, 12-4)
Hand Tools
NIKE #I-CH 612
ABB #6896 134-FL
ABB #6896 134-FA
ABB #6896 134-S
ABB #6896 134-AN
ABB #6896 134-FH

Table of Contents

Other manuals for ABB IRB6400

Related product manuals