Chapter 7 Verifying the Instrument Performance
Preparing the TaqMan
®
RNase P Verification Plate
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide 91
Notes
7
5. Verify that the liquid in each well of the plate is
at the bottom of the well. If not, centrifuge the
plate again at a higher speed and for a longer
period of time.
Continue with “Creating a Plate Document for the
RNase P Verification Run” on page 92.
Correct Incorrect
Liquid is at
bottom of well.
Not centrifuged with enough force,
or
Not centrifuged for enough time

Table of Contents

Other manuals for Applied Biosystems 7300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems 7300 and is the answer not in the manual?

Applied Biosystems 7300 Specifications

General IconGeneral
BrandApplied Biosystems
Model7300
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals