EasyManuals Logo

Applied Biosystems 7300 User Manual

Applied Biosystems 7300
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #119 background imageLoading...
Page #119 background image
Chapter 7 Verifying the Instrument Performance
Performing the Verification Run
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide 93
Notes
7
Performing the Verification Run
1. Load the plate in the instrument as described in
“Loading the Plate” on page 40.
Note: When closing
the instrument tray,
apply pressure to the
right side of the tray
and at an angle.
2. In the plate document:
a. Select the Instrument tab.
b. Click .
The instrument begins the run, which lasts 1.5 to
2 hours using a 7300/7500 Real-Time PCR
system or <40 minutes using a 7500 Fast
Real-Time PCR system.
Note: Before starting the run, the instrument
may pause (up to 10 minutes) to allow the heated
cover to reach the correct temperature.
3. When the run is complete, click .
Continue with “Analyzing the TaqMan
®
RNase P
Plate Data” on page 94.
Notched
corner
Well A1
12
GR2475
GR2475
7500
keyed corner
A1
A
B
C
D
E
F
G
H
123456789101112
A
1
7300/7500 System
Standard plate
7500 Fast System
Fast plate
Press
here
a
b
Click

Table of Contents

Other manuals for Applied Biosystems 7300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems 7300 and is the answer not in the manual?

Applied Biosystems 7300 Specifications

General IconGeneral
BrandApplied Biosystems
Model7300
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals