EasyManua.ls Logo

Applied Biosystems 7300 - Page 57

Applied Biosystems 7300
174 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Installing the Software and Powering On the Instrument
Performing the Instrument Function Test
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide 31
Notes
3
5. Select Instrument Function Test.
6. In the Function Test dialog box:
a. Click .
b. Examine the Pass/Fail column:
If all the function tests Pass, go to
step 7.
If any of the function tests Fail, see
“Troubleshooting – Function Tests” on
page 33.
c. Click .
7. Select FileClose to close the plate document.
8. When the software prompts you to save the plate
document, click .
9. In the SDS software, select FileExit.
Continue with “Performing the Regions of Interest
(ROI) Calibration” on page 35.
Select
a
b
c
Function Test – Lamp test failed.
Function Test – All tests passed.
Select

Table of Contents

Other manuals for Applied Biosystems 7300

Related product manuals