Chapter 3 Installing the Software and Powering On the Instrument
Performing the Instrument Function Test
Applied Biosystems 7300/7500/7500 Fast Real-Time PCR System Installation and Maintenance Guide 31
Notes
3
5. Select Instrument Function Test.
6. In the Function Test dialog box:
a. Click .
b. Examine the Pass/Fail column:
If all the function tests Pass, go to
step 7.
If any of the function tests Fail, see
“Troubleshooting – Function Tests” on
page 33.
c. Click .
7. Select FileClose to close the plate document.
8. When the software prompts you to save the plate
document, click .
9. In the SDS software, select FileExit.
Continue with “Performing the Regions of Interest
(ROI) Calibration” on page 35.
Select
a
b
c
Function Test – Lamp test failed.
Function Test – All tests passed.
Select

Table of Contents

Other manuals for Applied Biosystems 7300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems 7300 and is the answer not in the manual?

Applied Biosystems 7300 Specifications

General IconGeneral
BrandApplied Biosystems
Model7300
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals