5.2 Transport and handling
ARS s.r.l. uses packaging and fasteners according to the mode of transport to guarantee integrity and conservation during
transport.
When the machine is received, make sure no part was damaged during transport and/or handling.
If damage is found, it is mandatory to immediately inform the Manufacturer.
The handling activities described in this section must be carried out by personnel who are qualified for these operations: personnel
duly trained to safely perform the loading, unloading and handling operations with lifting equipment, and who are aware of the
accident prevention rules.
CAUTION!
ARS S.r.l. shall not be held liable for damage, to property or to people, due to accidents caused by failure to follow
the instructions in this manual.
5.2.1 Table of units and weights
After unpacking the machine, it is already fully assembled.
Follow the table below for the weights and dimensions of the various models.