169
Installing the Avaya™ S8700 Media Server with Avaya™ MCC1 or SCC1 Media Gateway
May 2003
2 Connect one end of the 10 AWG (#25) (2.5 mm
2
) wire to the single-point ground block
(or Ground Discharge Bar).
3 Route the wire next to the 25-pair cables connecting to the trunk/auxiliary (purple) field.
4 Tie wrap the 10 AWG (#25) (2.5 mm
2
) wire to the 25-pair cables.
5 Connect the 10 AWG (#25) (2.5 mm
2
) wire to the MDF CBC ground block.
6 Repeat the above steps for each CBC ground wire installed.
Coupled Bonding Conductor
Figure notes
1 25-Pair Tip & Ring Cables to Media
Gateways
2 Coupled Bonding Conductor (CBC)
Terminal Block
3 Tie Wraps
4 Cable Shield or Six Spare Pairs
5 Ground on Carbon Block Protector or
Equivalent
6 Trunk Cable to Network Interface
7 10 AWG (#25) (2.5 mm
2
) Wire
8 To Network Media Gateways
9 Battery Plant Ground Discharge Bar
for Single-Point Ground
10 Cross-Connect Ground Block
11 Main Distribution Frame (MDF)
12 To Other Cross-Connect Ground
Blocks
13 Approved Ground
14 Coupled Bonding Conductor (CBC)
cbc_gnd_1 PDH 062696