324 Installing the Avaya™ S8700 Media Server with Avaya™ MCC1 or SCC1 Media Gateway
Index
May 2003
Q
queue warning indicator, 253
testing, 298
R
recorded announcement, testing, 299
rectifier module, installing, 84
remote access
testing, 299
remote access to media server
over modem, 284
over network, 284
Remote Feature Activation. See RFA
remote power off cable, connecting, 90
reporting circuit pack damage or discrepancies, 64
reporting damage, 62, 186
RF shielding, 121
RFA, 20
information requirements, 20
website, 21
ribbon cables
connect on SCC1, 194
ringer frequency settings, 115
ringing, testing, 298
routing cables to MDF, 145
S
S8700 media server
connecting to LAN, 209
LEDs, 303
testing LEDs, 304
safety instructions
1145B power supply, 255
1151B1 and 1151B2 power supply, 270
SCC
connecting battery, 112
earthquake protection, 101
SCC control cabinet, connecting to DC power
cabinet, 106
SCC1 Media Gateway
location, 100
security certificate
install, Internet Explorer, 27
install, Netscape, 26
selector console, 232
selector console, testing, 298
server separation
collocated media server, 40
separated media server, 40
service states, checking, 291
set
date and time, 27
media server configuration type, 28, 42
SNMP traps, 38
set static IP address, 203
shielding, electromagnetic, 121
shipping errors, correcting, 66
shipping packing lists, 62
SHOCKWATCH indicators, 62, 186
shorting cable, 79
single-phase 240VAC, 72
site locations, adapters, 150
sneak current
fuse panels, 163
fuses, 163
sneak current protection, 163
sneak current protection, installing, 166
sneak current protectors
off-premises connections, 239, 240
sneak fuse panels, 128, 163
sneak fuse panels, installing, 166
sneak fuse, connector pinout, 163
SNMP traps
setting, 38
space requirements
110-type hardware, 128
cable slack manager, 128
sneak fuse panels, 128
SPAN LEDs, 314
stabilizing cabinets for earthquake protection, 119, 121
standard-reliability systems, cabling, 124
standards
electromagnetic compatibility, 3
static addressing
IPSI circuit pack, 200
static IP addressing
setting, 203
station cables, sizing, 128
station cables, wiring design, 150
station circuit distribution, 153
Stratum 3 clock, 177
administering, 302
cabling, 180
checking AC power, 178
connecting to DC power, 178
cross-connects
high or critical reliability, 182
standard reliability, 182
grounding cabinet, 178
installing, 177
LED indicators, 301
maximum cabling distance, 182
setting options, 179
testing, 301
testing LEDs, 301
timing, 302
wiring, 182
Stratum 3 clock, connecting AC power, 178
Stratum 3 clock, inspecting, 177
system status, checking, 291
system test alarms, 302
T
T1 CSU, and DS1 tie trunk, 221
T1/E1 status LEDs, 314
TDM bus