• Always test every installed segment with a cable tester. “Toning” alone is not an
acceptable test.
• Always install jacks so as to prevent dust and other contaminants from settling on the
contacts. The contacts of the jack should face up on the flush mounted plates, or
left/right/down on surface mount boxes.
• Always leave extra slack on the cables, neatly coiled in the ceiling or nearest concealed
location. Leave at least five feet at the work outlet side and 10 feet at the patch panel side.
• Choose either 568A or 568B wiring standard before beginning. Wire all jacks and patch
panels for the same wiring scheme. Don’t mix 568A and 568B wiring in the same
installation.
• Always obey all local and national fire and building codes. Be sure to firestop all cables
that penetrate a firewall. Use plenum rated cable where it is required.
CAUTION: This MergePoint SP manager contains an internal battery that is used for the real time clock. This
battery is not a field replaceable item, and replacement should not be attempted by a user. If real time clock errors
occur and the battery is suspected, visit http://www.avocent.com/support or contact the Avocent Technical Support
location nearest you.
WARNING: For Service Personnel Only - There is a risk of explosion if the battery is replaced with an incorrect
type. Dispose of used batteries according to the manufacturer’s instructions.
Chapter 1: Product Overview 9