3. Preventative maintenance actions
No.
Component
Maintenance action Remarks
31 Air Extraction
Check cus tomer air extraction system for adequate e xtraction.
The air extraction system must be
capable of removing minimum 6,65
m³/min or 235 CFM per installed
DP2K-12C/11CX digital p rojector. This
must be m easured at EACH individual
projector head exhaust stack.
32 Documen ta-
tion
Check if the projector manuals are p resent and up-to-date. Download c urrent manual version from
w
ww.My.Barco.com.
33 Documen ta-
tion
Update projector service docket. List all maintenance actions and
rema rks.
R5905043 DP2K-12C/11CX 19/02/2018 25