41 Installing the enclosure into the rack.................................................................................................................. 40
42 Securing the enclosure to the rack...................................................................................................................... 41
43 Installing the front bezel......................................................................................................................................... 41
44 Single node DD9410 with DS600 shelves.......................................................................................................... 44
45 HA DD9410 with DS600 shelves..........................................................................................................................45
46 Single node DD9910 with DS600 shelves.......................................................................................................... 48
47 HA DD9910 with DS600 shelves..........................................................................................................................49
48 DD9410 and DD9910 HA interconnect............................................................................................................... 50
49 Slot numbering.......................................................................................................................................................... 51
50 DS600 single phase power cabling......................................................................................................................52
51 DS600 three phase delta power cabling............................................................................................................ 52
52 DS600 three phase WYE power cabling............................................................................................................ 53
53 FS240 single phase power cabling...................................................................................................................... 53
54 FS240 three phase delta power cabling.............................................................................................................53
55 FS240 three phase WYE power cabling.............................................................................................................54
56 iDRAC Settings > Network....................................................................................................................................56
57 iDRAC Settings > User Configuration................................................................................................................ 56
58 SOL and USB ports................................................................................................................................................. 58
59 Open the system cover.......................................................................................................................................... 76
60 Installing a drive in a drive carrier........................................................................................................................ 77
61 Install the drive carrier in the enclosure............................................................................................................. 77
62 Install the system cover......................................................................................................................................... 78
63 Disk slots....................................................................................................................................................................86
64 Remove a cache drive............................................................................................................................................ 87
65 Install a drive blank.................................................................................................................................................. 87
Figures 7