EasyManua.ls Logo

Dorr EcoBell2 SL EC - 10.2 Separating the atomizer from the flange package; 10.3 Dismantling of the atomizer

Dorr EcoBell2 SL EC
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Manual
© Dürr Systems AG
140 / 156
EcoBell2 SL
EC - Rotating Atomizer with External Charging
Dismantling and Disposal
Document No.: MRA00001EN
Version:: 07 As of:: 01/2020
10.2 Separating the atomizer from the flange package
Personnel:
- Assembly personnel
Protective equipment:
- Protective work wear
- Protective glasses
- Protective gloves
- Safety boots
Procedure:
Release the clamping screw. Meanwhile, hold the atomizer tight.
Remove the atomizer from the flange.
Remove three plastic screws on the electrode ring.
Pull out electrode ring.
10.3 Dismantling of the atomizer
Personnel:
- Assembly personnel
Protective equipment:
- Protective work wear
- Protective glasses
- Protective gloves
- Safety boots
Process:
Dismantle the atomizer into individual parts.

Table of Contents