20 TP-00347-01
Chapter 2: Installation
Unpacking
Unpacking the Library
If the temperature in the room where the library is to be installed varies by 15°C
(30°F) or more from the room where the libra
ry was stored, allow the library to
acclimatize to the surrounding environment for at least 12 hours before
unpacking it from the shipping container.
Do not place the library on either the end or sides as this
may damage the unit.
Before unpacking the library, clear a work surface on
which to place the unpacked components. If
the library is to be installed in a rack, select an open rack location allowing easy access to the host
server and an easily accessible power outlet.
1. Before opening and removing the tape library from the box, inspect the container for
shipping damage. If you notice any damage, report it to the shipping company immediately.
2. Open the box.
3. Carefully remove the shipping materials from the top of
the library.
4. Remove the accessory package and set a
side (if included).
5. Remove the two rack rails and set a
side (if included).
6. Lift the library out of the carton and remove the bag from the loader. Save the packaging
materials for future use.
Identifying Product Components
Confirm that you received the following:
1) 24Q/48Q Ark Tape Library, including:
• 1 x Power Supply,
• 1 or more half-height T
a
pe drives (as ordered)
• 1 x Library controller
• 2 x Tape magazines for the 24Q - or:
4 x Tape magazines for the 48Q
2) Rack mount kit comprising:
• 2 x Rack Mount Rails
• 1 x Bag of eight M6 screws for the rack m
o
unting (9.5 mm square holes in the rack
column)
• 1 x Bag of eight M6 screws for rack mounting
(6.85 mm round holes in the rack
column)
3) Power cord
4) Library documentation
Optional components, depending on the purchased configuration:
• Cables - Fibre Channel or
SAS cables