Emerson Process Management GmbH & Co. OHG 2-5
2
Installation
X-STREAM X2FD
Instruction Manual
HASXMDE-IM-EX
01/2015
2.3 Gas Conditioning
2.3 Installation - Gas Conditioning
In order to ensure trouble-free operation, spe-
cial attention must be paid to the preparation
of the gases:
All gases must be conditioned
before supplying to the analyzer,
to be
• dry,
free of dust and
free of any aggressive com-
ponents which may damage
the gas lines (e.g. by corrosi-
on or solvents).
Pressure and gas ow must remain within
the values given in the „Measurement
Speci cations“ section within this manual.If
moisture cannot be avoided, it is necessary
to ensure that the dew point of the gases is at
least 10 °C (18 °F) below the ambient tempe-
rature to avoid condensate in the gas lines.
Hints for selected gases
Calibration gases for CO and NO need
to be moistured by supplying them via a
cooler.
EXPLOSION HAZARD
Do not supply gases harmful to explosion protection safety components
like ame arrestors, cable glands or analyzer enclosure!
Violation may result in explosion!

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Emerson ROSEMOUNT Xstream X2 Series and is the answer not in the manual?

Emerson ROSEMOUNT Xstream X2 Series Specifications

General IconGeneral
BrandEmerson
ModelROSEMOUNT Xstream X2 Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals