Emerson Process Management GmbH & Co. OHG 3-3
X-STREAM X2FD
Instruction Manual
HASXMDE-IM-EX
01/2015
3
Startup
3.3 Switching On
3.3 Switching On
Once the unit has been unpacked and in-
stalled, we recommend to fi rst check the
settings, and if necessary adjust them to the
user’s needs. e.g:
• What hardware is installed?
• Is the unit configured to your needs
(alarms, inputs, outputs, etc.)
In order for the information in this chapter
to be of any relevance, the unit must have
been installed according to the instructions
in chapter 2.
The following pages describe how to navigate
through the menus and what is to be observed
when confi guring the unit. For the fi rst startup
after installation, follow the step-by-step in-
structions for navigating the menus, allowing
you to familiarise yourself with the unit and its
software, and if necessary adjust the settings
to your needs.
EXPLOSION HAZARD
Before applying power and signals:
• Verify for proper installation
• Verify that all covers and plugs are properly installed and in place!
• Verify that all gas connections are tight.
Violation may result in explosion, personal injury or death!
Switch on the analyzer by applying power.
EXPLOSION HAZARD BY HOT COMPONENTS
Temperatures inside an analyzer for VAPOR RECOVERY applications exceed
the analyzer‘s temperature classifi cation for hazardous areas!
Special conditions apply to handling and operating this analyzer, consider
the safety instructions at the beginning of this manual!