EasyManua.ls Logo

Epson G20 Series

Epson G20 Series
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance 10. Ball Screw Spline Unit
G10 / G20 Rev.20 209
(15)
Install the end effector, and connect wires and tubes to the end effector.
(16)
This step is only for Cleanroom
-model and Protected-model (C,
D with bellows
option
, P).
Install the bellows.
For details, refer to Maintenance: 9. Bellows.
(17)
Perform the calibration of Joints #3 and #4.
For details, refer to Maintenance: 14. Calibration.

Table of Contents

Related product manuals