7. PUTTING INTO SERVICE
7.1 FINAL OPERATIONS
1. Carry out a complete functional test of the auto-
mation and all the installed devices.
2. Make sure that the forces generated by the leaf are
within the limits permitted by the current regula-
tions. Use an impact force tester in accordance
with standard EN 12453. For non-EU countries,
if there are no specific local regulations, the static
force must be less than 150 N. If necessary, adjust
the anti-crushing system and make any other
adjustments that may be necessary.
3. Make sure that the maximum force required to
move the leaf manually is less than 225 N in resi-
dential areas and 260 N in industrial or commercial
areas.
4. Highlight all areas with adequate warning signs
in which there are still residual risks, even if all
possible safety measures having been adopted.
5. Place a “DANGER, AUTOMATIC MOVEMENT” sign
(not supplied) in a prominent position on the gate.
6. Attach the CE marking to the gate.
7. Fill out the EC declaration of conformity and the
system register.
8. Give the EC Declaration, the system register with
the maintenance plan and the instructions for use
of the automation to the system owner/operator.
INSTALLING THE COVER
i
Install the cover once the gearmotor has been start-up.
Apply the adhesive sign to the cover: risk of fingers
and hands being trapped due to the rotation of the
pinion and the movement of the rack.
1. Install and fasten the cover.
2. Press the screw caps on.