25
746 C - 844 C 46 532150 - Rev.A
F+ -
8.8.
RADIO
+
1
2
3
4
5
6
7
8
9
10
11
12
18
19
20
21
22
23
24
IN1
IN2
IN3
IN4
IN5
IN6
IN7
2EASY
CAP
MOTOR
LAMP
17
16
15
14
13
RP/DECODER
F+ -
8.8.
RADIO
+
1
2
3
4
5
6
7
8
9
10
11
12
18
19
20
21
22
23
24
IN1
IN2
IN3
IN4
IN5
IN6
IN7
2EASY
CAP
MOTOR
LAMP
17
16
15
14
13
RP/DECODER
Ct = SE
Ct
= Pr
Translation of the original instructions
ENGLISH
It possible to install two gearmotors to move two
opposite opening doors.
One of the control boards is specified as the Primary
and the other as the Secondary. When in opera-
tion, the Primary board also drives the Secondary
board. The anti-crushing system is active on each
automation and reverses both leaves.
The installer decides which will be the Primary board
and which will be the Secondary board, taking into
account that:
- the control devices, with the exception of the
sensitive edges, have to be connected exclusively
to the Primary board
- the flashing light and Bus 2Easy devices can be con-
nected to the Primary or to the Secondary board.
1. Install one gearmotor for each leaf.
2. Connect the control devices and accessories.
3. Before connecting the boards together, turn on
power to the Secondary board and configure it
in Basic Programming (
Ct=SE), then switch off
the power.
4. Connect the 2 boards together on the Bus 2Easy
line. Respect the polarity shown in the figure.
5. Turn on power to both boards.
6. Use the Primary board to launch the setup proce-
dure: it is carried out simultaneously on both auto-
mations and registers Bus 2Easy the on the primary.
i
Alternatively, the setup can be carried out independently
on each automation, before connecting the boards
together. Subsequently, the BUS has to be registered
on the primary.
9. TWOLEAF AUTOMATION
Programming NOT available on the Secondary:
LO
Logics
PA
Pause time A
Pb
Pause time B
bu
Bus 2Easy registration
tl
Setup
PF
Pre-flashing
Ph
Closing photocells
oP
Opening photocells
IP
Reverse on obstacle
o1, p1, t1
o2
, p2, t2
Outputs OUT1, OUT2
Bus 2Easy status led on the Secondary board
DL1 (RED)
At least one device is in operation
No devices in operation
Primary / Secondary board connection inter-
rupted
DL2 (GREEN)
Always off
E781
primary
E781
secondary