EasyManua.ls Logo

FireClass FC501 - Installing the 38 Ah Battery Metal Box

FireClass FC501
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the 38Ah battery metal Box
Work carefully through the following steps (see Figure 14),
for the FC501-H/FC501-HK fire panel only.
1. Remove the two screws on the cover and open the
metal box.
2. Drill the anchor screw holes 64.
!
Check for water pipes and electrical wiring be
-
fore drilling.
3. If necessary, using a hammer or similar tool, remove
the surface conduit wire knockouts of the metal Box.
4. Secure the metal base to the wall.
+
The cable conduit union with the cabinet must be
secured by HB Flame Class (or higher) lock nuts
(see particular in fig.14).
5 Pull the wires through the cable entry and connect
them. See paragraph: "Connecting the power
supply".
P. Description
54 Thermal probe (see Fig.13 and14)
55 Flat cable for the connection with FC500IP
55a Serial port RS 232 (PC LINK)
55b Module IP (FC500IP) connector
55c PC Link cable
56 FC500IP fixing screws
57 FC500IP board
57a PC Link connector
58 Flat cable connector
59 Ethernet connector
60 38Ah Batteries cabinet (Accessory item)
61 Connecting Threaded tube
62
Nuts on Control Panel Backplate (FC501-H
and FC501-HK only)
63
Nuts on 38Ah Batteries Backplate (FC501-H
/FC501-HK)
64 Holes for cabinet mounting
26 Addressable Fire Panel FC501
AC/N
FG
+V
GND
B+
L
B–
GND
+V
AC/L
F 2A/25ØV
F6.3A/25ØV
FIRE
FAULT
-
LE LI
NC NO
C
NC NO
C
J1
+NAC1
+NAC2
MIC SPKBLK RED OC1 Oc2
24R 24A
RS485
+
-
24V
BAT
-
+
PSU
PC LINK
ADD ON
SH
+ LEFT - +RIGHT-
LOOP1
SH
+ LEFT - +RIGHT-
LOOP2
SH
+ LEFT - +RIGHT-
LOOP3
B078-P0
LCD
J5
ABC
JKL
STU
ESC
DEF
MNO
VWX
GHI
PQR
YZ
1
4
7
2
5
8
0
3
6
9
?
A
D
BC
EF
]
ABC
JKL
STU
ESC
DEF
MNO
VWX
GHI
PQR
YZ
1
4
7
2
5
8
0
3
6
9
?
A
D
BC
EF
]
55 5856
56
59
55b
57
54
57a
55a
55c
Figure 13 FC501 connection with the FC500IP.

Table of Contents

Related product manuals