EasyManua.ls Logo

Fronius Virtual Welding - Mains Switch with Mains Connection

Fronius Virtual Welding
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
(8) Connection socket for the helmet sensor or filler material sensor
for connecting the sensor cable of the welding helmet
for connecting the sensor cable of the filler material (TIG)
(9) Connection socket for the workpiece sensor
for connecting the sensor cable of the workpiece holder
Mains switch with
mains connection
The mains switch with fuse and mains connection is located on the back of the StandUp
terminal and of the MobileCase.
No. Function
(1) Mains switch
(2) Fuse
Terminal: 2 x 3.15 A fast-blow
MobileCase: 2 A fast-blow
(3) Mains connection
(1)
(2)
(3)

Table of Contents

Related product manuals