EasyManua.ls Logo

Fronius Virtual Welding - Page 43

Fronius Virtual Welding
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
EN
Plug the mains cable into the connecti-
on socket (1)
Plug the mains cable into a correctly
earthed socket
Set the mains switch (2) to the "I" posi-
tion
NOTE!
Hemisphere tracking must be carried out every time the system is started.
Detailed information about calibration can be found in the "Terminal management" section
under "Calibration: hemisphere tracking" in the "Additional settings" subsection.
(1)
(2)
1
2
3

Table of Contents

Related product manuals