EasyManua.ls Logo

Fujitsu PRIMERGY RX200 S2 - Other Notes on Operation

Fujitsu PRIMERGY RX200 S2
307 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
152
Chapter 5 Operations after OS Installation
5.5.6 Other Notes on Operation
Unnecessary Files
After OS installation is completed, folders named Runonce and Runonce 2 may be left in the drive
where the OS is installed. Delete these folders since you do not need them for the system operation.
Notes on 24-hour Operation
Automated System Operation
To provide an extra margin of safety against unintentional damage, introduce disaster-prevention
measures in the office and keep disaster prevention personnel (such as a security guard or janitor) in the
building.
Unintentional Power-off Prevention
We recommend the installation of a special power supply device (such as a distribution board) to prevent
unplanned power shut-offs.

Table of Contents

Other manuals for Fujitsu PRIMERGY RX200 S2

Related product manuals