EasyManuals Logo

GE AKTA avant User Manual

GE AKTA avant
538 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #173 background imageLoading...
Page #173 background image
5.4.2 Prime sample inlets and purge Sample Pump
Overview
The procedure consists of the following stages:
DescriptionStage
Prime all sample inlet tubing to be used during the run.1
Validate priming of inlet tubing.2
Purge the sample pump if pressure signal indicates air bubbles.3
Validate purge of the samle pump.4
End the run.5
To increase life length of the pump sealing rings, make sure that the pump
rinsing system is filled with fresh rinsing solution.
Note:
Prime sample inlets
Follow the instructions below to fill all sample inlet tubing, to be used in the run, with
appropriate buffer or sample solution.
ActionStep
Make sure that all sample inlet tubing that is to be used during the method
run is immersed in the correct samples or buffer.
1
Make sure that the waste tubing connected to injection valve port W2 is
immersed in a waste vessel.
2
Open the System Control module.3
ÄKTA avant User Manual 29035184 AE 173
5 Operation
5.4 Prime inlets and purge pump heads
5.4.2 Prime sample inlets and purge Sample Pump

Table of Contents

Other manuals for GE AKTA avant

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTA avant and is the answer not in the manual?

GE AKTA avant Specifications

General IconGeneral
BrandGE
ModelAKTA avant
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals