EasyManua.ls Logo

GE AKTA avant - UV Monitor U9-L Test

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.7 UV monitor U9-L test
Method description
UV U9-L test checks the functionality of the UV monitor U9-L.
The method run takes approximately 10 minutes.
Required configuration
A correctly installed UV monitor U9-L is required to run the test.
Required material
The following materials are required:
Distilled water
1% acetone in distilled water
Ref 1 tubing, see Reference tubing, on page 439
Syringe, 25 to 30 ml
Mixer, 1.4 ml
Prepare the UV U9-L test
Follow the instructions to prepare the system before method start.
ActionStep
Direct outlet tubing W and W1 to a waste container.1
Place inlet tubing A1 into distilled water.2
Place inlet tubing B1 into a solution of 1% acetone in distilled water.3
Connect the Ref 1 tubing on the Column valve position 1, to generate a back
pressure.
4
Make sure that the Mixer with a chamber volume of 1.4 ml is installed.5
For information on how to change Mixer, see Section 7.8.2 Replace the Mixer,
on page 338.
260 ÄKTA avant User Manual 29035184 AE
6 Performance tests
6.7 UV monitor U9-L test

Table of Contents

Other manuals for GE AKTA avant

Related product manuals