EasyManua.ls Logo

GE AKTA avant - Replace the UV Monitor U9-M Flow Cell

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.8.4 Replace the UV monitor U9-M flow cell
Maintenance interval
Replace the UV flow cell when it is desired to use a flow cell with a different path length,
or if the cell is damaged. Clean the optical fiber connectors if they have accidentally
been touched.
Required material
The following materials are required:
For replacement of flow cell
UV flow cell
For cleaning of the optical fiber connectors
Lens paper
Isopropanol
Replace the flow cell
CAUTION
Hazardous chemicals or biological agents in UV flow cell. Make
sure that the entire flow cell has been flushed thoroughly with
bacteriostatic solution (e.g., NaOH) and distilled water, before service
and maintenance.
Follow the instruction to replace the UV flow cell.
ActionStep
Switch off the instrument.1
Disconnect the tubing from the UV flow cell.2
342 ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.8 Replacement procedures
7.8.4 Replace the UV monitor U9-M flow cell

Table of Contents

Other manuals for GE AKTA avant

Related product manuals