7.5 Semiannual maintenance
Introduction
This section provides instructions for semiannual (once every six months) maintenance
activities.
In this section
This section contains the following subsections:
See pageSection
2837.5.1 Clean the UV flow cell
2867.5.2 Replace the pH electrode
282 ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.5 Semiannual maintenance