EasyManua.ls Logo

GE AKTA avant - Page 172

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Validate prime or purge of
System Pump A or B or Sample
Pump
Follow these instructions to check that there is no air left in the pump after performing
a prime or a purge.
ActionStep
In the Process Picture:1
Click on the Injection valve and select Manual load.
Result: The injection valve switches to manual load position.
Make sure that the pump flow is on.2
In the Chromatogram pane:3
Check the PreC pressure curve.
If the PreC pressure do not stabilize within a few minutes there may be
air left in the pump. Purge the pump once more then see Section 8.6
Troubleshooting: Pumps, on page 397.
End the run
Click the End button in the System Control toolbar to end the run.
172 ÄKTA avant User Manual 29035184 AE
5 Operation
5.4 Prime inlets and purge pump heads
5.4.1 Prime buffer inlets and purge system pumps

Table of Contents

Other manuals for GE AKTA avant

Related product manuals