EasyManua.ls Logo

GE AKTA avant - Page 171

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Purge System Pump A
Purge both pump heads of System Pump A by following the same procedure as in Purge
System Pump B, on page 168, but replace step 3 and 4 with the following:
ActionStep
In the Process Picture:1
Click the Inlet valve A icon.
Click the position of one of the inlets that will be used at the beginning
of the run.
Result: The inlet valve switches to the selected port.
In the Process Picture:2
Click the System pumps icon.
Set Conc % B to 0% B and click Set % B.
Result: Only System Pump A is active.
ÄKTA avant User Manual 29035184 AE 171
5 Operation
5.4 Prime inlets and purge pump heads
5.4.1 Prime buffer inlets and purge system pumps

Table of Contents

Other manuals for GE AKTA avant

Related product manuals