EasyManua.ls Logo

GE AKTA avant - Page 296

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Open the System Control module, on the System menu, click Calibrate.3
Result: The Calibration dialog opens.
In the Calibration dialog, in the Monitor to calibrate list, click pH.4
Click Prepare for calibration.5
Result: The pH valve switches to the calibration position.
Fill a syringe with approximately 10 ml of 1 M NaOH. Connect the syringe to
the pH valve port Cal, and inject the solution. Leave the cleaning solution in
place for 20 minutes.
6
Fill a syringe with distilled water. Connect the syringe to the pH valve port
Cal, and inject the distilled water.
7
Click Close.8
Result: The pH valve switches back to the default position and the Calibration
dialog closes. No calibration is performed.
296 ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.6 Maintenance when required
7.6.2 Perform System CIP

Table of Contents

Other manuals for GE AKTA avant

Related product manuals