EasyManua.ls Logo

GE AKTA avant - Page 306

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Click Prepare for Calculation.3
Result: The pH valve switches to the calibration position.
Prepare at least 10 ml storage solution by mixing equal volumes of a stan-
dard buffer, pH 4, and a 1 M Potassium Nitrate (KNO
3
) solution.
4
Fill a syringe with approximately 10 ml of the storage solution. Connect the
syringe to the pH valve port Cal, and inject the storage solution.
5
Click Close.6
Result: The pH valve switches back to the default position and the Calibration
dialog closes. No calibration is performed.
306 ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.6 Maintenance when required
7.6.6 Storage of the pH electrode

Table of Contents

Other manuals for GE AKTA avant

Related product manuals