EasyManua.ls Logo

GE AKTA avant - Page 332

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Prepare for calibration
Follow the instructions to prepare for the calibration of the UV monitor U9-L.
ActionStep
Ensure that the flow restrictor is inline in the flow path after the UV flow cell.1
Mount the union Luer female/1/16” male, included in the test kit, in the upper
inlet of the UV flow cell.
2
Open the UV-900 cell calibration Excel-file.3
The solution bottles are labelled with the concentration value and the refer-
ence absorbance value for each solution. Enter the concentrations of the
solutions in ascending order into the column UV Test kit Concentration
(mg/l). Enter the corresponding absorbance values into the column UV Test
kit Absorbance (AU/cm).
4
Perform the calibration
Follow the instructions to calibrate the second UV Monitor U9-L.
ActionStep
Open the System Control module. On the Manual menu, click Execute
Manual Instructions.
1
Result: The Manual instructions dialog box opens.
In the Manual Instructions dialog box:
Select Pumps:System flow and set the Flow rate to 0.0 ml/min.
Click Execute.
Result: The absorbance can now be monitored.
Fill one of the supplied syringes with 1.5-2 ml of the first solution (0 mg/l).
Ensure that there are no air bubbles in the syringe.
2
332 ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.7 Calibration procedures
7.7.4 Calibrate the UV monitors

Table of Contents

Other manuals for GE AKTA avant

Related product manuals