EasyManua.ls Logo

GE AKTA avant - Page 346

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Unscrew the knurled wheel at the bottom of the UV monitor. Press the wheel
upwards to release the flow cell.
3
Pull the flow cell upwards out of the monitor. Hold the flow cell by the top
part with the O-ring: do not touch the optical surfaces of the flow cell.
4
Note:
Make sure that the flow cell does not come into contact with any liquid, and
that no liquid enters the monitor.
Insert a new flow cell into the monitor.5
Tighten the knurled wheel firmly.6
Connect the tubing to the new flow cell.7
Switch on the instrument and log on to UNICORN.8
Update the UV flow cell path length in the Calibrate dialog box, in the
System Control module.
9
346 ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.8 Replacement procedures
7.8.5 Replace UV monitor U9-L flow cell

Table of Contents

Other manuals for GE AKTA avant

Related product manuals