Hydran* M2-X Instruction Manual
MA-029 Rev. 1.0, 30-Jul-18
Analog Output Cable (If Used)
1. Run the cable through a conduit
2. Verify all wires are identified at both ends
3. Connect the wires to the corresponding I/O terminal block
4. Connect the other end of the cable to the SCADA system
1. Run the cable through a conduit
2. Remove the plastic cover from the ac power supply terminal block
3. Connect the wires to the ac power supply terminal block
4. Connect the other end of the cable to the power source
Verifying the Hydran M2-X Operation
1. Fasten the cover with the four screws
2. Verify all cable entry points to ensure they are watertight
3. Verify the heating plate is warm
Configuring the Hydran M2-X
Setting the Date and Time
Setting the Parameters of the History Files
1. Set Short Term Rate to _________ minutes
2. Set Long Term #1 to _________
3. Set Long Term #2 to _________
4. Set Long Term #3 to _________
5. Set Long Term #4 to _________
6. Erase the content of Short Term history file
7. Erase the content of Long Term history file
Setting the Alarm Parameters
1. Wait 30 minutes or until levels are stable